Production Planning and Control - II |
 |
Order types
When defining production order types, the following system
parameters are controlled:
- Order type
- collective order
- combination order
- standard order
- Scheduling procedure
- forward scheduling
- backward scheduling
- Transaction type
- automatic goods issue
- automatic goods receipt
- Reservation
- Customized print layouts and so on
Scheduling
It is possible to choose between
- forward
- backward or
- midpoints
scheduling.
When scheduling, for each operation target start and target
end time with float is determined minute-precise.
Status
Different status fields enable users a distinguished control
of each production order. Status fields like
Status fields like
- opened,
- released,
- partial confirmation,
- completion confirmation,
- partial delivered,
- delivered,
- printed
are generated automatically by the system.
Goods issue to Production Orders
Each item in the listing can be chosen either for deletion,
when there is no goods issue,
or for changes of the stock outward movement quantity. Materials
which are defined by back flush in the material master will
not be posted in this moment. Only when posting an inward
stock movement of finished goods, the posting for each material
will be done (please look at goods receipt from production
orders).
For additional parts needed, e. g. because of a higher rate
of scrap, an unplanned withdrawal is possible. Those parts
will be charged to the corresponding production order.The
actual values of the goods withdrawal will be updated in the
production order. At any time it is possible to compare actual
values with target values. Automatic goods issue and/or goods
receipt can be pre-adjusted through the production order.
CANIAS ERP - Get Advantages and Functionality With Production Planning and Control - II
|