MRP - Material Requirements Planning Module |
 |
| |
|
- Facility-based requirements planning
- Multi-dimensional data display
- Graphical monitoring of data
- Facility-based set up of planning and timing parameters
- Preparation of planning order based on facility scale
|
|
| |
|
- Gross/net requirements planning
- Primary or secondary requirements planning (solutions to multi-level product trees)
- Multiple planning methods:
- Stochastic
- Deterministic, with or without forecasting
- Reorder point procedure
- Methods for specification of multiple lot sizes:
- Least-unit cost procedure
- Fixed order amount
- Maximum inventory levels
- Part-period balancing
- Multiple forecasting methods
- Inventory requirements status
- Multiple planning methods:
- Planning for single material
- Combined planning
- Net change planning (for processed materials only)
- Preparation of production planning
- Reservation of materials
- Association of independent requirements with other documents within the system (project, customer, order
number)
- Monitoring of planning results using multiple report formats:
- Monitoring of planning results associated with defined reminders
- Monitoring of planning results in detail and with graphical displays
- Ability to define planning parameters on a facility basis
- Ability to define time parameters on a facility basis
|
|
|